dual shape over clouds

Status

Completed

for LND/BOS Only

Dual Shape Diagram

Total Dual Funded Capacity

SAT 20,000,000

20.0M SAT / 0.2 BTC / ~$0

Funding Amount

SAT 10,000,000

10.0M SAT / 0.1 BTC / ~$0

Spaces Available

None

All 2 spaces are filled

Channel Duration

12 months or more

Open at least till: January 22, 2025

Participant Restrictions

Platform

LND/BOS Only

A Lightning Network Daemon node with the tool Balance of Satoshis installed required.

Channels

40 channels

Minimum number of channels

Capacity

200,000,000 SAT

Minimum total channel capacity

Description

This is a Bitcoin Lightning Network dual funded channel agreement, designed to help LN node operators generate both outgoing and incoming liquidity, increase connectivity and decentralization of the network.

Agreement ID: 18878 was created on December 24, 2023 by Megalith.

What to Do Next?

The Swap has been completed.


Node

Channel Open Reported

Applied: almost 3 years ago
Last Seen: about 2 years ago
Capacity: 82.267 BTC
Public Channels: 133
Connection: Clearnet / Tor
Rank: 10 / Iridium
45 Ratings: 96% Happy
Prime Node

Channel open reported complete

Node

Channel Open Reported

Applied: over 2 years ago
Last Seen: 11 months ago
Capacity: 7.602 BTC
Public Channels: 63
Connection: Clearnet / Tor
Rank: 9 / Platinum
63 Ratings: 95% Happy
Prime Node

Activity Log

  1. System recorded the current state during historical backfill.

    Snapshot at backfill time; earlier actions and their dates are unknown.

    September 13, 2026 at 03:30:51 UTC

    Trashed: No

    Swap setup status: Setup completed

    Rebalance node: Not set

    Rebalance completed: Yes

    Rebalance dismissed: No

    Tor: Yes

    Prime: No

    Private: No

    Capacity (sats): 10000000

    Clearnet: Yes

    Duration (months): 12

    Platform: lnd

    Rebalance: No

    Description: Not set

    Positions: 2

    Minimum capacity (sats): 200000000

    Min channels: 40

    Participants at backfill time:

    Megalithic.me (A) — completed

    Rust-eze (now BoltTrustiC) (B) — completed

  2. System reconstructed channel opening from the swap's saved start date.

    Reconstructed from saved data. Names reflect profiles at backfill time.

    January 22, 2024 at 10:13:36 UTC

  3. System reconstructed Rust-eze (now BoltTrustiC) (B) joining the swap from the application's saved creation date.

    Reconstructed from saved data. Names reflect profiles at backfill time.

    January 22, 2024 at 10:13:36 UTC

  4. System reconstructed Megalithic.me (A) joining the swap from the application's saved creation date.

    Reconstructed from saved data. Names reflect profiles at backfill time.

    December 24, 2023 at 17:54:51 UTC

  5. System reconstructed swap creation by Megalith from the saved creation date.

    Reconstructed from saved data. Names reflect profiles at backfill time.

    December 24, 2023 at 17:54:51 UTC

Comments

Sorry, once the Liquidity Swap is full, only participants of this swap can read or post comments.